Clinical loads don’t tolerate mystery breakers — every critical branch got home-run labels and photos in the closeout packet for facility engineering.
Working around schedules
We sequenced tie-ins around patient hours with the building engineer so adjacent suites stayed live unless a planned window was signed off.